Commonly Used Tcodes in PP Module Part 1

MATERIAL
CREATE-GENERAL       MM01       IMMEDIETELY
                     MM11       SCHEDULE
CHANGE               MM02       IMMEDIETELY
                     MM12       SCHEDULE
                     MM13       ACTIVATE

FLAG FOR DELETION    MM06       IMMEDIETELY
                     MM16       SCHEDULE
DISPLAY              MM03       DISPLAY CURRENT
                     MM19       DISPLAY AT KEY DATE
DISPLAY CHANGES      MM04       ACTIVE CHANGES
                     MM14       SCHEDULE CHANGES
                     MM17       MASS MAINTENANCE
                     MMAM       CHANGE MATERIAL TYPE
OTHER                MMBE       STOCK OVERVIEW
                     MMPV       CLOSE PERIOD
                     MMRV       ALLOW POSTING TO
                                PREVIOUS PERIOD
                     MM50       INSTANT MATERIAL VIEW
                     MMSC       ENTER STORAGE LOCATIONS
                     MM60       MATERIAL LIST
ARCHIVING(MATERIAL)  MM71       ARCHIVE/DELETE
                     MM72       DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)

                     CS01       CREATE
                     CS02       CHANGE
                     CS03       DISPLAY
EXTRAS               CS28       ARCHIVING
                     CS20       MASS CHANGES
EVALUATION/BOM       CS11       BOM MULTILEVEL
EXPLOSION/MATERIAL   CS12       STRUCTURE MULTILEVEL
BOM                  CS13       SUMMURISED BOM
WORK CENTRES
                     CR01       CREATE
                     CR02       CHANGE
                     CR03       DISPLAY
                     CA85       REPLACE
CAPACITY             CR11       CREATE
                     CR12       CHANGE
                     CR13       DISPLAY
HIERARCHY            CR21       CREATE
                     CR22       CHANGE
                     CR23       DISPLAY
LINE HIERARCHY       LDB1       CREATE
                     LDB2       CHANGE
                     LDB3       DISPLAY
REPORTING            CR60       W/C INFORMATION SYSTEM
                     CR05       W/C LIST
                     CR06       COST CENTRE ASSIGNMENT
                     CR07       W/C CAPACITIES
                     CR08       W/C HIERARCHY
WHERE USED           CA80       WORK CENTRE
                     CR15       CAPACITY
                     CR10       CHANGE DOCUMENTS
EXTRAS               CR09       STD. TEXTS TASK LIST
                     CR41       ARCHIVING
ROUTING
STAD. ROUTING        CA01       CREATE
                     CA02       CHANGE
                     CA03       DISPLAY
REF. OPERATION SETS  CA11       CREATE
                     CA12       CHANGE
                     CA13       DISPLAY
RATE ROUTING         CA21       CREATE
                     CA22       CHANGE
                     CA23       DISPLAY
REF. RATE ROUTING    CA31       CREATE
                     CA32       CHANGE
                     CA33       DISPLAY
EXTRAS               CA85       REPLACE W/C
MASS CHANGES         CA95       REPLACE REF. OP. SET
                     CA75       REPLACE PRT
DELETE TASK LIST     CA99       WITH ARCHIVING
                     CA98       W/O ARCHIVING
REPORTING            CA80       WORK CENTRE
WHERE USED LIST      CA90       REF. OP. SETS
                     CA70       PRODUCTION RESORCE TOOLS
COST CENTRE
                     OKKP       MAINTAIN CONTROLLING AREA
                     KS01       CREATE COST CENTRE
                     KZS2       CREATE COSTING SHEET
                     KA01       CREATE PRI. COST ELEMENT
                     KA06       CREATE SEC. COST ELEMENT
                     KL01       CREATE ACTIVITY TYPE
                     KP26       ACTIVITY TYPE/PRICE PLANNING

Commonly Used Tcodes in PP Module Part 2

SALES AND OPERATIONS PLANNING
PRODUCT GROUP        MC84       CREATE
                     MC86       CHANGE
                     MC85       DISPLAY GRAPHIC              MC91       PRODUCT GROUP
                     MC92       OVERVIEW
PLANNING             MC81       CREATE

FOR PRODUCT GROUP    MC82       CHANGE
                     MC83       DISPLAY
                     MC75       TRANSFER PG TO PLANNING
FOR MATERIAL         MC87       CREATE
                     MC88       CHANGE
                     MC89       DISPLAY
                     MC74       TRANSFER MATERIALS TO DM
                     MC9K       MATERIAL AVAILABILITY
VERSION MANAGEMENT   MC78       COPY
                     MC80       DELETE
FLEXIBLE PLANNING    MC93       CREATE
PLANNING             MC94       CHANGE
                     MC95       DISPLAY
                     MC9K       MATERIAL AVAILABILITY
TOOLS/PLANNING TYPE  MC8A       CREATE
MACRO                MC8B       CHANGE
                     MC8C       DISPLAY
EVENT                MC64       CREATE
                     MC65       CHANGE
                     MC66       DISPLAY
ROUGH CUT PLANNING   MC35       CREATE
PROFILE              MC36       CHANGE
                     MC37       DISPLAY
ENVIRONMENT          MC90       TRANSFER MATERIALS TO DM
ACTIVITY REQT.       KSPP       TRANSFER TO COST CENTRE
                     KSBL       COST CENTRE OLANNING REPORT
                     KSOP       TRANSFER TO ACTIVITY BASED COSTING
                     CPBL       PLANNING REPORT PROCESSES
                     MC9C       REPORTING
SETTINGS             MC96       FORECAST PROFILE
DISSAGGRIGATION      MC76       BREAKDOWN PG PLAN
                     MC77       DISPLAY PG PLAN
                     MC75       TRANSFER PG TO PLANNING
                     MC74       TRANSFER MATERIALS TO DM

FORECASTING
INDIVIDUAL FORECAST  MP30       EXECUTE
                     MP31       CHANGE
                     MP32       DISPLAY
TOTAL FORECAST       MP38       EXECUTE
                     MP33       REPROCESS
                     MP39       PRINT
                     MPBT       EXECUTE BACKGROUND
                     MPDR       PRINT BACKGROUND
DEMAND MANAGEMENT
PIR                  MD61       CREATE
                     MD62       CHANGE
                     MD63       DISPLAY
                     MD65       REQTS. FOR SCINARIO
                     MD66       COPY SIMULATED DEPENDENT REQT.
                     MD70       COPY TOTAL FORE CAST
EVALUATION           MD73       DISPLAY TOTAL REQT.
                     MD79       EXCELL INTERFACE
                     MD4C       ORDER REPORT
                     MD72       CHARECTERISTICS PLANNING
CUSTOMER REQT.       MD81       CREATE
                     MD82       CHANGE
                     MD83       DISPLAY

REPETITIVE MANUFACTURING
MASTER DATA          C223       PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN          CKMATSEL   CREATE
SELECTION LIST       CKMATCON   Edit
                     CK40N      EDIT COSTING RUN

Commonly Used Tcodes in PP Module Part 3

Material Requirement Planning Menu Nodes TransactionActivity Master Data
MD25             Create planning calendar
MD26             Change planning calendar
MD27             Display planning calendar
MDSA             Display BOM explosion number
MDSP             Edit BOM explosion number
MEQ1             Maintain quota file
OPPP             Explode BOM by date
MDUS             Display project assignment
MDUP             Process project assignment
MDL1             Create production lot
MDL2             Change production lot
MDL3             Display production lot
Planning
MD20             Create planning file entry
MD21             Display planning file entry
MDAB             Set up planning file entry in background
MDRE             Check planning file entry
MD01             Total planning online
MDBT             Total planning in background
MD03             Single-item, single-level planning
MD02             Single-item, multi-level planning
MD43             Interactive single-item planning
MD50             Multi-level, make-to-order planning
MD51             Multi-level project planning
MF52             Display planning table
MF50             Change planning table
MF57             Planning table by MRP lists
MF51             Planning table by production list
Evaluations
MD04             Stock/requirements list
MD07             Collective access of stock/requirements lis
MD05             MRP list
MD06             Collective access of MRP lists
MDLD             Print MRP list
MD45             Planning result
MD46             Collective access of planning result
MD44             Planning situation for a material
MD47             Planning situation for a product group
MD48             Cross-plant planning situation
MD4C             Order report
MD09             Pegged requirements
CO46             Order progress
Planned Order
MD11             Create planned order
MD12             Change planned order
MD13             Individual access of planned order
MD16             Collective access of planned orders
MD14             Individual conversion of planned order into
MD15             Collective conversion of planned orders int
MDUM             Convert planned order into purchase requisi
CO40             Convert individual planned order into produ
CO41             Collective conversion of planned orders int
CO48             Partial conversion of planned order into pr
COR7             Individual conversion of planned order into
COR7_PC       Collective conversion of planned orders int
COR8             Partial conversion of planned order into pr
MDVP             Collective availability check
MDAC             Execute action for planned order
LONG TERM PLANNING PALNNING SCENARIO
MS31             CREATE
MS32             CHANGE
MS33             DISPLAY
PLANNING RUN         
MS01             ON LINE
MSBT             SA BACKGROUND JOB
MS02             SINGLE ITEM - MULTI LEVEL
MS03             SINGLE ITEM - SINGLE LEVEL
MS50             SINGLE ITEM - SALES ORDER
MS51             SINGLE ITEM PLANNING, PROJECT
MFSO             PLANNING TABLE
EVALUTIONS      
MS05             MRP LIST MATERIAL
MS06             MRP LIST COLLECTIVE DISPLAY
MSLD             PRINT MRP LIST
MS04             STOCK/REQUIREMENTS LIST
MS07             STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
MS44             PLANNING SITUATION MATERIAL
MS47             SITUATION PRODUCT GROUP
MPS-MASTER SCHEDULE ITEMS
TOTAL PLANNING   
MD40             ON LINE
MDBS             SA BACKGROUND JOB
MD41             SINGLE ITEM - MULTI LEVEL
MD42             SINGLE ITEM - SINGLE LEVEL
MD43             SINGLE ITEM - INTERACTIVE
MD50             SINGLE ITEM - SALES ORDER
MD51             SINGLE ITEM PLANNING, PROJECT
*** EVALUTION IS SIMILAR TO MRP
PRODUCTION CONTROL
ORDER - CREATE       
CO01             WITH MATERIAL
CO07             WITHOUT MATERIAL
CO40             FROM PLANNED ORDER
CO41             COLLECTIVE CONVERTION OF PLANNED ORDER
CO08             FOR SALES ORDER
CO10             FOR PROJECT
CO02             CHANGE
CO03             DISPLAY
CONTROL         
MD04             STOCK/REQUIREMENTS LIST
COHV             MASS PROCESSING
COMAC           COLLECTIVE AVAILABILITY CHECK
CO05N           COLLECTIVE RELEASE
CO04N           PRINT
CO09             AVAILABILITY OVER VIEW
GOODS MOVEMENT  
MF65             STOCK TRANSFER FOR RESERVATION
MATERIAL STAGING
MF68             LOG
MB1A             GOODS ISSUE
MB31             GOODS RECEIPT
COWBPACK     PACK MATERIAL
CONFIRMATION    
CO1V             TIME TICKET
FOR OPERATION        
CO14             DISPLAY
CO13             CANCEL
CO1L             REQUESTED CONFIRMATIONS
CO1P             PREDEFINED PROCESSES
TOOLS-ARCHIVING 
CO78             ORDER
KOAA             SETTELMENT DOCUMENTS
CAPACITY PLANNING
EVALUTION        
CM01             LOAD

WORK CENTER VIEW     
CM02             ORDERS
CM03             POOL
CM04             BACKLOG
CM05             OVERLOAD
CM07             VARIABLE
EXTENDED EVALUTION   
CM50             WORK CENTER VIEW
CM51             INDIVIDUAL CAPACITY VIEW
CM52             ORDER VIEW
LEVELLING           
CM21             PLANNING TABLE (GRAPHICAL)
WORK CENTER VIEW     
CM22             PLANNING TABLE (TABULAR)
INDIVIDUAL CAPACITY 
VCM27             PLANNING TABLE (GRAPHICAL)
CM28             PLANNING TABLE (TABULAR)
ORDER VIEW           
CM31             PLANNING TABLE (GRAPHICAL)
CM32             PLANNING TABLE (TABULAR)
AVAILABLE CAPACITY  
CR12             CHANGE
CAPACITY            
CR13             DISPLAY
OP4A             SHIFT SEQUENCE
OP43             FACTORY CALENDER